MS , Mining Engineering- Rock Mechanics , Shahrood University OF Technology , 2005 → 2008


2024

Evaluation of TBM disk cutting tool performance in jointed rocks using numerical modeling

The second international conference on civil engineering modern and practical findings

Hadi Bejari Valam - 1402/12/17

Choosing the optimal tunneling method in the rocky environment using the fuzzy AHP-TOPSIS method

The second international conference on civil engineering modern and practical findings

Hadi Bejari Valam - 1402/12/17
2018

Open TBM in Challenging Difficult Ground Conditions - A Case study From Alborz Tunnel, Iran

9th International Symposium on Eastern Mediterranean Geology

Hadi Bejari Valam - 1397/02/17

INTEGRATED ENTROPY-AHP AND FUZZY TOPSIS FOR SELECTING THE OPTIMAL TUNNELING METHOD

9th International Symposium on Eastern Mediterranean Geology

Hadi Bejari Valam - 1397/02/17
2016

-

-

Hadi Bejari Valam - 1395/08/13

-

سومين كنفرانس ملي مهندسي عمران و توسعه پايدار ايران

Hadi Bejari Valam, - 1395/08/13
2015

Fuzzy Analytical Hierarchy Process for Mineral Exploration Potential Mapping a Case Study in Kamoshgaran Region (NW Iran)

24th International Mining Congress and Exhibition of Turkey

Ali Akbar Daya, Hadi Bejari Valam - 1394/01/25

Selection of Chromite Processing Plant Site Using The Fuzzy TOPSIS Approach

24th International Mining Congress and Exhibition of Turkey

Hadi Bejari Valam, Ali Akbar Daya - 1394/01/24


2024

stability analysis of Emarat open pit mine slope

Hadi Bejari Valam - 2024

Selection of Chromite Processing Plant Site Using the Fuzzy Analytic Hierarchy Process (Fuzzy-AHP) A

Hadi Bejari Valam, Ali Akbar Daya, -


1 - Hadi Bejari Valam, jafar khademi hamidi, A PARAMETRIC STUDY OF TWO SOLUTIONS FOR TBM JAMMING PROBLEM IN SQUEEZING GROUND CONDITIONS , International Journal of Civil Engineering and Technology. (2018) 9 862-878
2 - Hadi Bejari Valam, Ali Akbar Daya, , Selection of chromite processing plant site using fuzzy analytic hierarchy process (FAHP) , Journal of Mining and Environment. (2017) 8 155-162
3 - Ali Akbar Daya, Hadi Bejari Valam, مقايسه روشهاي كريجينگ معمولي و ساده در تخمين ذخاير معدني با مطالعه موردي مس چهل كوره , Arabian Journal of Geosciences. (2015) -
4 - Ali Akbar Daya, Hadi Bejari Valam, A comparative study between simple kriging and ordinary kriging for estimating and modeling the Cu concentration in Chehlkureh deposit, SE Iran , Arabian Journal of Geosciences. (2015) 8 6003-6020
5 - Ali Akbar Daya, Hadi Bejari Valam, A comparitive study between ordinary kriging and simple kriging for modelling cu values in chelkureh , Arabian journal of geosciences. (2014) -
6 - Ali Akbar Daya, Hadi Bejari Valam, A comparative study between simple kriging and ordinary kriging for estimating and modeling the Cu concentration in Chehlkureh deposit SE Iran , Arabian Journal of Geosciences. (2014) -
7 - Hadi Bejari Valam, , Simultaneouus effects of joint spacing and orientation on TBm cutting efficiency in jointed Rock masses , ROCK MECHANICS AND ROCK ENGINEERING. (2013) 46 897-907
8 - Hadi Bejari Valam, , Simultaneous Effects of Joint Spacing and Orientation on TBM Cutting Efficiency in Jointed Rock Masses , ROCK MECHANICS AND ROCK ENGINEERING. (2013) 46 897-907